Standby
In case of a standby of the machine (standby = 2 months):
The first thing to do is to test your machine in a lab.
If the machine stops running for a long time, you could have sediment in some places.
More precisely in small area like the spray nozzle.
4.2 Protections
It is necessary to place before the machine:
o
A water shut off valve.
o
An electrical protection standard, suitable for voltage and power consumption.
4.3 Water supply
Recommended operating pressure from 1.5 MPa to 6 MPa
Water connection pin 3/8"
The water supply pipes must resist to 145 Psi / 10 MPa
4.4 Drain
Without pressure.
A tip on the outlet of the machine and a pipe is supplied with the machine
Ensure a connection that causes no risk of fluid return, and ensure good drainage:
The drain pipe must be located lower than the machine.
Do not create a bend in the exhaust tube.
4.5 Supplying voltage
To be specify when ordering :
230V
– 50/60Hz Monofase
Or :
400V
– 50/60Hz Trifase
Summary of Contents for MONTE-CARLO
Page 1: ...MONTE CARLO 11 2015 SOFT V 2 11 1 TECHNICAL DOCUMENTATION...
Page 46: ...MONTE CARLO 11 2015 SOFT V 2 11 46 17 ELECTRIC DRAWING 17 1 CPU board...
Page 47: ...MONTE CARLO 11 2015 SOFT V 2 11 47 17 2 Electrical power diagram for 400V 3L N PE...
Page 48: ...MONTE CARLO 11 2015 SOFT V 2 11 48 17 3 Electrical power diagram for 230 V 1L N PE...
Page 49: ...MONTE CARLO 11 2015 SOFT V 2 11 49 17 4 Connecting diagram 12 fuses box...
Page 50: ...MONTE CARLO 11 2015 SOFT V 2 11 50...
Page 51: ...MONTE CARLO 11 2015 SOFT V 2 11 51...
Page 52: ...MONTE CARLO 11 2015 SOFT V 2 11 52...
Page 53: ...MONTE CARLO 11 2015 SOFT V 2 11 53 17 5 Solid state relay interface for 400 V 3NAC...
Page 54: ...MONTE CARLO 11 2015 SOFT V 2 11 54 17 6 Low voltage wiring...
Page 55: ...MONTE CARLO 11 2015 SOFT V 2 11 55 18 HYDRAULIC SCHEME...