![Conti MONTE-CARLO Technical Documentation Manual Download Page 10](http://html1.mh-extra.com/html/conti/monte-carlo/monte-carlo_technical-documentation-manual_2656562010.webp)
MONTE-CARLO - 11/2015 - SOFT V 2.11
10
F. Main display
When the machine is ready, the general display shows:
Boiler pressure (bar)
Pressure
(network/pump pressure)
Level information
(In progress)
Press “where you want” on the display, during 3 sec to switch
OFF
the machine
The display shows:
ON/OFF
Summary of Contents for MONTE-CARLO
Page 1: ...MONTE CARLO 11 2015 SOFT V 2 11 1 TECHNICAL DOCUMENTATION...
Page 46: ...MONTE CARLO 11 2015 SOFT V 2 11 46 17 ELECTRIC DRAWING 17 1 CPU board...
Page 47: ...MONTE CARLO 11 2015 SOFT V 2 11 47 17 2 Electrical power diagram for 400V 3L N PE...
Page 48: ...MONTE CARLO 11 2015 SOFT V 2 11 48 17 3 Electrical power diagram for 230 V 1L N PE...
Page 49: ...MONTE CARLO 11 2015 SOFT V 2 11 49 17 4 Connecting diagram 12 fuses box...
Page 50: ...MONTE CARLO 11 2015 SOFT V 2 11 50...
Page 51: ...MONTE CARLO 11 2015 SOFT V 2 11 51...
Page 52: ...MONTE CARLO 11 2015 SOFT V 2 11 52...
Page 53: ...MONTE CARLO 11 2015 SOFT V 2 11 53 17 5 Solid state relay interface for 400 V 3NAC...
Page 54: ...MONTE CARLO 11 2015 SOFT V 2 11 54 17 6 Low voltage wiring...
Page 55: ...MONTE CARLO 11 2015 SOFT V 2 11 55 18 HYDRAULIC SCHEME...