7. Feed fiber through the machine, seals, and venturi into the duct (Figure 44).
8. Feed fiber through machine and mark the fiber at the back end of the Gulfstream™ 350e
(Figure 45).
9. Pull 10' (3 m) of fiber back out of the duct (Figure 46).
10. Set the motor speed regulator and clamp force regulator. With small fiber, start at 20psi
(Figure 47 & 49).
11. Belts should be in the open position and needle valve should be off (Figure 64).
12. Lower the belts to engage the fiber. Turn air on and engage belts, which will start the
belts. Fiber should be installing (Figure 48).
Figure 44. Run the Fiber
Figure 45. Mark the Fiber
Figure 46. Pull Back Fiber
Figure 47. Motor Speed Regulator