![Condair RS series Installation Manual Download Page 58](http://html1.mh-extra.com/html/condair/rs-series/rs-series_installation-manual_2651779058.webp)
58
Mounting and installation work
ACCESSORY BOARD
REMOTE BOARD
BMS
LinkUp
SAB
3V
CR2032
BAT
SD
J7
J4
J8
J11
(USB)
(RJ45)
GND
+
–
GND
+
–
GND
+
–
24V
GND
MAINS SUPPLY
L N SC1SC2PEPE
MODULE B
24VDC
LEVEL
UNIT
POWER
BOARD
DRN1 J2 INLET J1
PWR
SUPPLY
BLOWER
LIMIT
ENABLE
CONTROL
V+
X8
X9
X12
X11
X10
X7
X1
INGND IN GND
24V IN
24V IN
24V GND
RS485
RS485
PWRIC
CONT-
ACTOR
HEAT GR.
2+3
JP2 (24V)
JP1 (10V)
PUMP
AC
SWITCH
GND
D–
D+
GND
D–
D+
24V
GND
DRN2 J3
F1
SW1
F2
H1
Error
1 2 3
Service
4 5 6
Steam
7 8
Unit On
9 10
H2
Hyg. Valve A
FAN B
1 2 3
Hyg. Valve B
4 5 6 7 8
FAN A
9 10
L1 L2 L3
L1
L2
L3 PE
K1
THV
Q3
F3
Y1
200-600 V/3~/50..60 Hz
230 V/1~/50..60 Hz
L1
N
PE
Q3
F3
B3
B2
B1
L1 N PE
F4
Q4
230 V/1~/50..60 Hz
K2
J3
J1
230V
M
L1
N
PE
140Ω...10kΩ
A2
On/Off
A3
GND
IN
V+
IN
V+
JP1
JP2
A1
A4
Y
+ –
Z
+ –
B4
140Ω...10kΩ
A5
GND
IN
V+
JP1
Z
L1 L2 L3
400-500 V/3~/50..60 Hz
400-415 V/3~N/50..60 Hz
F3
Q3
L2 L3
L1
L2 L3 PE
L1
L1 N PE
F3
Q3
L2
L3
PE
N
L1
L2 L3
L1
N PE
L1
Control compartment
Driver board
Option TR (3Ph)
Option CVI (3Ph+N)
5.7.2 Wiring diagram Condair RS 5...40 - Single units "S" and "M"
Fig. 27: Wiring diagram Condair RS - Single units "S" and "M" (5...40 kg/h)
A1 Continuous humidity controller (active) or humidity sensor
A2 Ohmic humidity controller (passive),
set jumper JP1 and remove jumper JP2
A3 On/Off humidity controller,
set jumper JP2 and remove jumper JP1
A4 Limiter signal
A2 Ohmic limiter controller, set jumper JP1 and remove jumper JP2
B1 Ventilation interlock
B2 Airflow monitor
B3 Safety humidistat
B4 External enable contact
F1
Internal fuse 24V supply (1 A, slow acting)
F2
Internal fuse 230V supply (6.3 A, slow acting)
F3
External fuse heating voltage supply
(see table in
chapter 5.7.7
)
F4
External fuse control voltage (max. 10 A, slow acting)
J1
Jumper wire, if blower pack safety loop is not connected
J3
Jumper wire, if no monitoring devices are connected to SC1 and SC2
J4
Jumper for activating the terminating resistor for Modbus network
(Jumper must be connected, if Condair RS is the last unit in the
Modbus network)
J7
Jumper for activating Modbus or BACnet MSTP communication via
RS485 interface (J6). If jumper is not in place no communication will
take place through the RS485 interface.
H1 Remote operating and fault indication (option)
H2 Accessory board (option) for the control of an external fan of the AHU
as well as the optional external valve for the water supply line flushing
K1 Mains contactor (heating voltage)
K2 External safety circuit (safety humidistat, airflow monitor, etc.)
M
Motor blower pack
Q3 External main switch heating voltage supply
Q4 External main switch control voltage supply
SW1 Rotary switch Module identification (must be left on position "0")
THV Terminal Heating voltage supply (option)
Y1 Total drain valve (option)
6.3 A, slow acting
6.3 A, slow acting
Ethernet (RJ45) IP
network / BMS BACnet IP
RS 485 BACnet MSTP
Control board
Summary of Contents for RS series
Page 76: ...76 Appendix 6 2 EC Declaration of conformity...
Page 77: ...Notes...
Page 78: ...Notes...
Page 79: ......