![Comtech EF Data KST-2000L Installation And Operation Manual Download Page 39](http://html1.mh-extra.com/html/comtech-ef-data/kst-2000l/kst-2000l_installation-and-operation-manual_2648543039.webp)
Chapter 4. OPERATION
This chapter describes the procedures for initial testing of a KST-2000L system, and de-
scribes each major system function.
4.1
Initial Setup
This section details the procedures necessary to laboratory test a KST-2000L system for
the first time. Refer to Figure 4-1 for system setup.
J2 REMOTE
J4 IF OUT
J3 IF IN
GND
(ERDE)
J1 PRIME
POWER
AC POWER
SOURCE
EARTH
GROUND
RF OUT J6
RF IN J7
HPA J8
LNB
HPA
J1
J3
J2
FROM MOD
TO DEMOD
KP10
PC
OR
MON
TERM
Figure 4-1. System Block Diagram
4–1