T
IME
V
ISION
P
LUS
F
ACE
S
CAN
M
ANUAL
P
AGE
7
|
28
Installing the Clocking Terminal
Step 1
Affix the paper template to the wall and drill three holes
within the three marked circles on the paper template.
We recommend affixing the template about 3.6 feet (
1.1m
)
above the ground, assuming the average height of your
users is 5-6 feet tall (
1.55m-1.85m
). If the average body
height of your users is over 5.4 feet (
1.65m
), consider
installing the terminal 4 feet (
1.65m
) above the ground.
Step 2
Align the wall mounted base to the holes on the wall, and use three screws to fix it on to
the wall (
figure 1
).
Align the iron board to the holes on the wall mounted base, and use four screws to fix it
on to the wall mounted base (
figure 2
).
Connect the device with the iron board (from the top down) to ensure it is tightly jointed
with the board (
figure 3
).
Finally, use one screw to fix the device and the iron board (
figure 4
).
Summary of Contents for TIMEVISION PLUS FACESCAN
Page 1: ......