23. Measure the height of the top rail to insure proper swing height.
24. Check the level of the entire structure and adjust as necessary.
25.
When you are satisfied that the structure is level, mix and pour the concrete according to the package directions. You
will use approximately seven 80# bags in the ladder hole and 1 ½ bags in each of the leg holes.
26. Allow the concrete to cure completely before using your swing set. (3-5 days).
27. Attach chains and swinging items and enjoy your Component Playground.
Summary of Contents for PH45
Page 2: ......
Page 3: ......
Page 8: ...GROUND SPACE 18 X 32 RESIDENTIAL PLAY SPACE 22 X 41 Model PH45...
Page 16: ......