Platform
Support
Plate
Playhouse Leg
f.
Slide three playhouse legs into the sleeves as shown in the layout illustration. The mark previously made at
4 ½” on each post should be positioned in between the two sleeves at the top of the barriers.
g.
Stand the platform into the third position (each barrier has a numbered position in each layout illustration).
Line up the holes in the legs with the holes previously drilled into the platform support plates. (The platform sup-
port plates should be vertical.) Attach the platform to the legs. In each leg use the following: 2- 5/16” x 3 ½” hex
bolts, 2- 5/16” fl at washers and 2- “T” nuts.
Figure 4a
Figure 4b
h.
Begin folding up the barriers around the platform to create the four sides of the playhouse as shown in fi gure
3a and 3b. Continue to fold up the barriers and attach each leg to the platform as previously done. Tighten the set
screws as you go.
i.
Carefully roll the playhouse structure to gain access to and tighten all set screws. Figure 3c.
Figure 3c
Summary of Contents for PH45
Page 2: ......
Page 3: ......
Page 8: ...GROUND SPACE 18 X 32 RESIDENTIAL PLAY SPACE 22 X 41 Model PH45...
Page 16: ......