An Introduction to Dielectric Withstand Testing with the HT-2000P .......................................................4
Safety Precautions........................................................................................................................4
Test Personnel................................................................................................................4
Testing Area...................................................................................................................4
Safety Techniques..........................................................................................................5
Using the HT-2000P Dielectric Withstand Tester .......................................................................5
Ground Check................................................................................................................5
Ground Check Failures....................................................................................5
Defeating the Ground Check ...........................................................................6
Leakage Test ..................................................................................................................6
Sporadic Leakage Current Failures .................................................................7
Chronic Leakage Current Failures...................................................................7
High Voltage Dielectric Withstand Test........................................................................7
High Voltage Dielectric Withstand Test Failures............................................8
High Voltage Discharge ..................................................................................8
Testing Equipment with non-Standard Plugs or Pigtail Operation................................8
Introduction and Specifications..................................................................................................................9
Introduction..................................................................................................................................8
Specifications ...............................................................................................................................9
Operation ....................................................................................................................................................11
Setting up your Tester ..................................................................................................................11
AC Line Voltage Requirements ...................................................................................................11
Fuse Replacement ........................................................................................................................11
Front and Rear Panel Features .....................................................................................................11
Initial Checkout Procedure...........................................................................................................16
Setting up the HT-2000P for Production Line Testing ................................................................17
Factory Settings .............................................................................................................17
Display of Leakage Limit and Duration settings............................................................17
Adjustment of the Leakage Current Level.....................................................................18
Adjustment of the High Voltage Ramp Time ................................................................18
Adjustment of the High Voltage Level..........................................................................18
Adjustment of the High Voltage Test Duration .............................................................19
Setting the Ground Check Switch..................................................................................19
Operating Techniques ..................................................................................................................19
Daily Operation Test......................................................................................................20
Testing ...........................................................................................................................20
Test Verification procedure when using the HTT-1 function checker: ...........20
Test Verification procedure when NOT using the HTT-1 function
checker: ...........................................................................................................20
Test results .....................................................................................................................21
Hipot Pass........................................................................................................21
Red LED/Buzzer .............................................................................................21
Technical Assistance ..................................................................................................................................22
Maintenance and Calibration......................................................................................................................24
Introduction..................................................................................................................................24
Service Information......................................................................................................................24
General Maintenance ...................................................................................................................24
Interior Access ...............................................................................................................24
Calibration Access...........................................................................................25
Cleaning .........................................................................................................................25
Calibration Procedure ..................................................................................................................25
Voltage Calibration Adjustment ....................................................................................25
Continuity Calibration Adjustment................................................................................26
Summary of Contents for HT-2000P
Page 2: ......
Page 4: ...2 ...
Page 14: ...11 Figure 2 Controls Indicators Connectors Model HT 2000P Front Panel ...
Page 16: ...13 Figure 3 Controls Indicators Connectors Model HT 2000P Rear Panel ...
Page 18: ...15 ...
Page 26: ...23 ...