16
Initial Checkout Procedure
The following procedure will verify that the HT-2000P is working correctly. We
recommend that this procedure be conducted periodically to ensure proper operation of the tester.
(A Compliance West HTT-1 function tester may also be used to verify the HT-2000P is working
correctly.)
The following items are needed to conduct this procedure:
- A three inch piece of 18 AWG insulated hookup wire with each end stripped back ½".
- A extra test lead with a banana plug on one end. The other end will be clipped to the
alligator clip end of the black test lead supplied with the HT-2000P.
CAUTION
High voltage (up to 2000 Volts AC) generated by the HT-2000P is exposed
during this test. A risk of shock exists. Exercise care when using the HT-
2000P.
Performance Test
1.
Connect the tester to a proper source of supply using the included 18 AWG power supply
cord. Turn the HT-2000P on.
2. Turn
the
Ground Check
switch on the rear panel to the Off position.
3.
Disconnect all leads.
4.
Push the red
RESET
button. Verify the yellow
TEST
indicator is lit.
5.
Push the yellow
TEST
button.
6.
The Tester should conduct a test sequence. At the end of the test, the
Ground OK
,
Ground Open
,
Full Voltage
,
Hipot Pass
, and red
RESET
LED’s should be lit.
7. Turn
the
Ground Check
switch on the rear panel to the On position.
8.
Verify that all test leads are disconnected from the HT-2000P.
9.
Push the red
RESET
button, then the yellow
TEST
button.
10. The tester should sound the buzzer. The red
Ground Open
and red
RESET
LED’s should
be lit.
11. Plug the supplied return test lead into the
RETURN
receptacle on the front panel.
12. Connect the banana plug end of the extra test lead from above into the grounding jack of the
orange
DEVICE
receptacle. The grounding jack is circular in shape and is located at the
bottom of the
DEVICE
receptacle.
13. Connect the other end of the extra test lead from above to the black lead plugged into the
RETURN
receptacle.
14. Push the red
RESET
button and then the yellow
TEST
button.
15. The tester should conduct a test sequence. At test termination, the
Ground OK
,
Full
Voltage
,
Hipot Pass
, and Red
RESET
LED’s should be lit.
16. Turn
the
Ground Check
switch on the rear panel to the Off position.
17. Disconnect the extra test lead from the
DEVICE
receptacle. The black lead should remain
plugged into the
RETURN
receptacle on the front panel.
18. Connect one end of the hookup wire to the clip of the black lead and insert the other end
into one of the vertical parallel slots in the
DEVICE
receptacle on the front panel.
Keep
clear of the wire while the test is in progress
.
19. Push the red
RESET
button and then push the yellow
TEST
button.
20. The tester should conduct a test sequence, terminated with a buzzer. At test termination, the
Ground OK
,
Ground Open
,
Excess Leakage
, and red
RESET
LED’s should be lit.
Note
: The
Hipot Fail
LED may also light during this test.
Summary of Contents for HT-2000P
Page 2: ......
Page 4: ...2 ...
Page 14: ...11 Figure 2 Controls Indicators Connectors Model HT 2000P Front Panel ...
Page 16: ...13 Figure 3 Controls Indicators Connectors Model HT 2000P Rear Panel ...
Page 18: ...15 ...
Page 26: ...23 ...