4
4.7
Install the cable with the cable attachment plate in the closure
body on the cable termination point.
4.8
Hold the cable in the correct position and secure the cable
attachment bracket with the stainless steel cable clamp to the cable.
Position the strength members between the plates.
4.9
Install the cable with the cable attachment plate in the closure
body on the cable termination point.
B
Central core cable
5.1
Splicing cable 1 to cable 2.
5 Fiber organisation
A
24 splice tray
5.2
Route first the incoming fiber from both sides into the groove
behind the splice holder. Be sure the fibers are beneath all the lips.