TC-96302-IP
Page 22
© 2021
CommScope
. All Rights Reserved.
5.9 Field Termination
Use the following procedure referring to
for an example of correct cable routing in the
EPX panel.
1. Insert adapter pack into opening provided in bulkhead, oriented so that adapters pass through
.
2. After connectorization, route buffered fibers from cable toward front of tray.
3. Terminate connector end of pigtails into module adapter openings in standard sequence.
4. Spool excess fiber slack length.
5. Repeat items 1-4 for all remaining locations.
Figure 21. Cable Routing in EPX Panel
Note:
On a 2U panel, start on bottom row first.