TC-96302-IP
Page 17
© 2021
CommScope
. All Rights Reserved.
5.6 Installing MPO Modules
1. Align the MPO module with the selected location in the bulkhead. Push in and secure with
push in pin if present (LGX/1000 only). Refer to
Figure 13. Installing MPO Modules (G2)
Figure 14. Installing MPO Modules (LSX/1000)
27412-A
27397-A
27397-A
SECURE WITH
PUSH PIN