background image

 

Installation (continued)

Installing the mounting base

Junction Box

 

Route the junction box wires through the large center hole 
in the mounting base (D).

 

Align the holes on the mounting base (D) with the holes on 
your junction box. Use two (2) or four (4) #8 screws (AA), 
depending on the size of the holes in your junction box, to 
attach the mounting base (D) to your junction box. (Fig. 1)

Surface Conduit Mount

 

Mark and drill two to four holes on the wall surface as per 
the desired location for installing the mounting base (D).

 

Use two or more suitable screws (not included) applicable 
to the surface of mounting and attach the mounting base 
(D) on the surface. (Fig. 2)

Fig. 1

Fig. 2

D

AA

D

M

O

C

.

T

O

P

E

D

E

M

O

H

.

e

c

n

a

t

s

i

s

s

a

 r

e

h

t

r

u

r

o

3

1

3

0

-

7

2

5

-

7

7

8

-

1

 t

c

a

t

n

o

c

 

e

s

a

e

l

P

Summary of Contents for 1008367367

Page 1: ...to enhance your home Visit us online to see our full line of products available for your home improvement needs Thank you for choosing Commercial Electric Questions problems missing parts Before retu...

Page 2: ...d found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC rules These limits are designed to provide reasonable protection against harmful interference when the equ...

Page 3: ...e s a e l P Junction Box Mount Use a junction box to mount the Surface Conduit Mount mounted directly on the wall surface using conduit entry To ensure proper dusk to dawn operation ensure the photoc...

Page 4: ...odes Dusk to Dawn Switch Controlled TOOLS REQUIRED Phillips screwdriver Safety goggles Silicone sealant Wire strippers cutter Circuit tester Work gloves Ladder Power drill 4 Pre Installation continued...

Page 5: ...all switch is in the OFF position Turn OFF power at the circuit breaker that supplies power to the outlet box you are working on For screw in type fuses unscrew the fuse that supplies power to the out...

Page 6: ...unt Measure the size of your junction to knock out For 3 1 4 in junction box Knock out two holes in the inner ring For 4 in junction box Knock out two holes on the outer ring For surface mount Measure...

Page 7: ...holes in your junction box to attach the mounting base D to your junction box Fig 1 Surface Conduit Mount Mark and drill two to four holes on the wall surface as per the desired location for installin...

Page 8: ...e nuts BB 0 10V Dimmable Wiring Method common by twisting the exposed wires together and using the wire nuts BB Ensure there are no loose wires wire by twisting the exposed wires together and using th...

Page 9: ...rises thus saving you energy Ensure the switch powering the outlet connected to the all times to enable dusk to dawn functionality to operate automatically IMPORTANT NOTE If photocell E is located in...

Page 10: ...or to work OR place the optional black cover over the photocell light sensor and use the wall switch to turn the light ON and OFF The light sensor is faulty few minutes then the sensor may be faulty P...

Page 11: ...roblems missing parts Before returning to the store call Commercial Electric Customer Service 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday 1 877 527 0313 HOMEDEPOT COM Retain this manual for...

Reviews: