background image

6

Installation (continued)

NOTE:

 The mounting base screws (C) come pre-installed 

Removing the mounting base

 

Loosen the two mounting base screws (C) using a Phillips 

 

and stays connected on the hinge. (Fig. 2)

CAUTION:

 DO NOT touch the LED and photocell lens (E) 

Fig. 1

C

D

Removing the knock outs on the 

mounting base

 

For junction box mount: Measure the size of your junction 

to knock out.

 

For 3-1/4 in. junction box: Knock out two holes in the inner 
ring.

 

For 4 in. junction box: Knock out two holes on the outer 
ring.

 

For surface mount: Measure the distance between two 
holes, pre-drill holes into the mounting surface, and drill 
holes on the desired ring accordingly.

 

Use a power drill to drill out the two holes.

NOTE:

  If necessary, you may drill out mounting holes 

through the back plate housing to correspond with the 
junction box or wall surface for level mounting.

Fig. 2

Summary of Contents for 1008367367

Page 1: ...to enhance your home Visit us online to see our full line of products available for your home improvement needs Thank you for choosing Commercial Electric Questions problems missing parts Before retu...

Page 2: ...d found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC rules These limits are designed to provide reasonable protection against harmful interference when the equ...

Page 3: ...e s a e l P Junction Box Mount Use a junction box to mount the Surface Conduit Mount mounted directly on the wall surface using conduit entry To ensure proper dusk to dawn operation ensure the photoc...

Page 4: ...odes Dusk to Dawn Switch Controlled TOOLS REQUIRED Phillips screwdriver Safety goggles Silicone sealant Wire strippers cutter Circuit tester Work gloves Ladder Power drill 4 Pre Installation continued...

Page 5: ...all switch is in the OFF position Turn OFF power at the circuit breaker that supplies power to the outlet box you are working on For screw in type fuses unscrew the fuse that supplies power to the out...

Page 6: ...unt Measure the size of your junction to knock out For 3 1 4 in junction box Knock out two holes in the inner ring For 4 in junction box Knock out two holes on the outer ring For surface mount Measure...

Page 7: ...holes in your junction box to attach the mounting base D to your junction box Fig 1 Surface Conduit Mount Mark and drill two to four holes on the wall surface as per the desired location for installin...

Page 8: ...e nuts BB 0 10V Dimmable Wiring Method common by twisting the exposed wires together and using the wire nuts BB Ensure there are no loose wires wire by twisting the exposed wires together and using th...

Page 9: ...rises thus saving you energy Ensure the switch powering the outlet connected to the all times to enable dusk to dawn functionality to operate automatically IMPORTANT NOTE If photocell E is located in...

Page 10: ...or to work OR place the optional black cover over the photocell light sensor and use the wall switch to turn the light ON and OFF The light sensor is faulty few minutes then the sensor may be faulty P...

Page 11: ...roblems missing parts Before returning to the store call Commercial Electric Customer Service 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday 1 877 527 0313 HOMEDEPOT COM Retain this manual for...

Reviews: