background image

 

 

 
 

 

 

Step 11: 

Then secure part 015 (power board), using 4x8mm bolts and nylock nuts to 

part 017. 

 

 

Step 12: 

Secure part 003 (lap top tray) to part 017 using 2x 8x20mm CHB’s, 2x 8mm 

washers and nylock nuts. 

 

 

Step 13: 

Plug the actuator 013/ 011 extension leads into the actuator leads.013 

actuators (column) plug into #1 & 2 on the control box. Actuators 011 (tilting) plug 

into # 3 & 4. 

 

 

NOTE: Please cable tie any leads after observing how much slack is required 

during the operation of the trolley. This will ensure nothing is damaged during 

normal operation.  

 

 

Step 14: 

Bolt the 011 actuators to part 002 using 2off 10 x 65mm bolts  

and nylock nuts 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: Do not over tighten these bolts. There will be some movement of the tilting 

actuator on this bolt during operation.

 

 

 

 

 

 

 

Summary of Contents for Tilt Trolley

Page 1: ......

Page 2: ...you have received a paper copy of the instruction guide please contact CommBox Support for an electronic copy of the guide This will enable you to expand out the photos for better recognition of Parts...

Page 3: ...ng of this product ease of construction was our highest priority One of the steps taken was to use Cup Head Bolts referred to as CHB The use of this fastening system enables construction with limited...

Page 4: ...arts 020 to parts 001 Once castors are secured using a soft blow hammer knock in the plastic end caps 008 into the ends of 001 Note the lockable castors go to the rear shorter end Step 2 Align parts 0...

Page 5: ...ecure parts 004 to 005 Step 4 Minimum of two people required for this step Aligning the control cable of 013 to the inside secure both columns to the base structure using 8x 6x25mm bolts 4off 8x20mm C...

Page 6: ...There is a second mounting hole for the 8x20mm CHB from the side higher than shown here The second 8x20mm CHB that secures the cable tray assembly is shown below NOTE The 8x20mm CHB circled will need...

Page 7: ...all bolts are in secure the 8x20mm CHB s from Step 6 do not over tighten the 10mm nut Step 8 Using parts 002 018 one 10x 30mm CHB bolt 10mm nylock nut per side place two 018 washers between parts 002...

Page 8: ...Step 9 Place the cable tray structure 006 onto the lift columns 013 The fixing screws should be lined up as shown in the upper mounting position...

Page 9: ...re pushed through the large hole in parts 006 Step 9 Using 8 6x25mm bolts secure parts 006 to 013 lift Columns as shown above Step 10 Using 4x12mm bolts and 4mm nylock nuts secure the control box part...

Page 10: ...13 actuators column plug into 1 2 on the control box Actuators 011 tilting plug into 3 4 NOTE Please cable tie any leads after observing how much slack is required during the operation of the trolley...

Page 11: ...sition The cradle should be level with the vertical actuators Step 16 Temporarily plug the Control Head into the powerboard Once it has been plugged in and all personnel tools cabling etc have been se...

Page 12: ...panels supplied hardware or two of the 8x12 20mm bolts and 8mm washers Apply the foot brackets for the remainder of the assembly Step 17 Using a minimum of two people raise the panel and locate part 0...

Page 13: ...slightly Once both steps are completed the trolley is ready to go Additional Notes Transportation When moving your tilt trolley around your campus place the touchscreen in the vertical position and lo...

Reviews: