CommBox Tilt Trolley Installation Manual Download Page 3

 

 

 

This Flat Panel Convertible Trolley has been designed as a generic  

product and some of the fasteners, holes and procedures may not  

apply to your products individual needs. Mounting some of the items  

to this product will require you to consult the manufactures instructions,  

Do so accordingly! 

 

During the build-up of the FPMC there are a number of areas that lifting of parts 

etc can have adverse effects on personnel and parts if guidelines are not strict ly 

adhered to. Please read any Notes carefully prior to completing each step. 

 

During the engineering of this product ease of construction was our highest 

priority. One of the steps taken was to use Cup Head Bolts, referred to as CHB. 

The use of this fastening system enables construction with limited and basic 

hand tools. 

 

Read each step thoroughly prior to starting that step. If you have any questions 

relating to the build-up of this product please contact your re-seller for 

guidance. 

 

Parts Identification - All parts will be assigned a three digit number for ease of 

identification. Ensure shipping box has arrived in serviceable condition. Open 

box and remove all parts. Lay out for ease of identification. The breakdown of 

the bolt pack contents is on the last page. 

 

 

000

 

002

 

003

 

004

 

005

 

001

 

006

 

007

 

008

 

009

 

010

 

011

 

012

 

013

 

014

 

015

 

016

 

017

 

018

 

019

 

020

 

Summary of Contents for Tilt Trolley

Page 1: ......

Page 2: ...you have received a paper copy of the instruction guide please contact CommBox Support for an electronic copy of the guide This will enable you to expand out the photos for better recognition of Parts...

Page 3: ...ng of this product ease of construction was our highest priority One of the steps taken was to use Cup Head Bolts referred to as CHB The use of this fastening system enables construction with limited...

Page 4: ...arts 020 to parts 001 Once castors are secured using a soft blow hammer knock in the plastic end caps 008 into the ends of 001 Note the lockable castors go to the rear shorter end Step 2 Align parts 0...

Page 5: ...ecure parts 004 to 005 Step 4 Minimum of two people required for this step Aligning the control cable of 013 to the inside secure both columns to the base structure using 8x 6x25mm bolts 4off 8x20mm C...

Page 6: ...There is a second mounting hole for the 8x20mm CHB from the side higher than shown here The second 8x20mm CHB that secures the cable tray assembly is shown below NOTE The 8x20mm CHB circled will need...

Page 7: ...all bolts are in secure the 8x20mm CHB s from Step 6 do not over tighten the 10mm nut Step 8 Using parts 002 018 one 10x 30mm CHB bolt 10mm nylock nut per side place two 018 washers between parts 002...

Page 8: ...Step 9 Place the cable tray structure 006 onto the lift columns 013 The fixing screws should be lined up as shown in the upper mounting position...

Page 9: ...re pushed through the large hole in parts 006 Step 9 Using 8 6x25mm bolts secure parts 006 to 013 lift Columns as shown above Step 10 Using 4x12mm bolts and 4mm nylock nuts secure the control box part...

Page 10: ...13 actuators column plug into 1 2 on the control box Actuators 011 tilting plug into 3 4 NOTE Please cable tie any leads after observing how much slack is required during the operation of the trolley...

Page 11: ...sition The cradle should be level with the vertical actuators Step 16 Temporarily plug the Control Head into the powerboard Once it has been plugged in and all personnel tools cabling etc have been se...

Page 12: ...panels supplied hardware or two of the 8x12 20mm bolts and 8mm washers Apply the foot brackets for the remainder of the assembly Step 17 Using a minimum of two people raise the panel and locate part 0...

Page 13: ...slightly Once both steps are completed the trolley is ready to go Additional Notes Transportation When moving your tilt trolley around your campus place the touchscreen in the vertical position and lo...

Reviews: