Ensure the columns cables are pushed through the large hole in parts 006.
Step 9:
Using 8 6x25mm bolts secure parts 006 to 013 (lift Columns) as shown above
Step 10:
Using 4x12mm bolts and 4mm nylock nuts secure the control
box (part 010) to the cable tray 017.