Page 10
Installation
Instructions
3/ 4 (or 1/
Screws
(7)
2 )
Lock Frame
(2)
Sash Lock
(1)
Window sash
seal foam
(1)
Lock Frame
(2)
(For Wooden
windows)
(For Vinyl-Clad
windows)
(on some models)
Lower sash must open sufficiently to allow a clear
vertical opening of 13 inches (330mm). Side
louvers and the rear of the AC must have clear air
space to allow enough airflow through the
condenser, for heat removal. The rear of the unit
must be outdoors, not inside a building or garage.
PREPARE THE WINDOW
1
Mounting Hardware
A: Remove the air conditioner from the carton
and place on a flat surface.
B: Remove top rail and R1 hardware and weather
stripping from the packaging material as shown
in Fig. A(R1 hardware and weather stripping are
only available for≥15000Btu / h Energy star
models).
Packaging
Fig.A
Top Rail
R1 hardware
R1 hardware
Top Rail Hardware
3/8 Screws
4)
Top Rail
1)
R1 hardware
2)
(10 *3/4 *1/12 )
Weather stripping
5)
PREPARE AIR CONDITIONER
2
3
INSTALL THE ACCORDION PANELS
NOTE:
The top rail hardware and the Fig.A,
Fig.B and Fig.C are not applicable to the units
more than 10000Btu/h.Before installing unit,
the top rail must be assembled on the unit
(For <10000Btu/h models only).
C: Align the hole in the top rail with those in the
top of the unit as shown in Fig.B
D: Secure the top rail to the unit with the 3/8"
Screws as shown in Fig.C.
Fig.1
Fig.C
Fig.B
NOTE:
For safety reasons, all four(4) screws MUST
be securely fastened.
NOTE:
Top rail and Sliding Panels at each side
are offset to provide the proper pitch to the rear
of (5/16 "). This is necessary for proper condensed
water utilization and drainage. If you are not
using the Side Panels for any reason, this pitch to
the rear must be maintained.
A.Place unit on floor, a bench
or a table. Hold the Accordion
Panel in one hand and gently
pull back the center to free
the open end. See Fig.1
Summary of Contents for RADS Series
Page 2: ......