3
INSTALLATION OF THE ELEMENTS
The main detector installation steps are as follows:
Step
Step description
1
Securing the detector base
2
Electrical connections
3
Securing the optical block
4
Activating the laser pointer (press button)
5
Securing the reflector
6
Deactivating the laser pointer (press button)
Caution:
Leave a free area of at least 30 cm around each element installed on the wall.
A.2.4. Flush-mounted base
The flush-mounted base is dedicated to
recessing the E / R in a wall or dividing
wall.
The text on the base
helps you position it
correctly on the wall.
A.2.5. Surface-mounted base
The text on the base
(reference 3) helps
you position it
correctly on the wall.
Summary of Contents for 48BFC000
Page 9: ...9...