instruction for the service people
18
STEAM ELIMINATION
For machines with splash-guard protection with collar or machines with heat recovery unit,
connections are to be effected according to fig.5.
BEFORE STARTING THE MACHINE
•
The boiler circuit breaker QFE10 (and QFE11) has to be open (position OFF). Before
reactivating it, check, after having switched on the machine that the boiler is full of water by
making sure that water is coming out of the rinsing nozzles.
•
Make sure that all motors turn in the right direction; generally this can be taken for granted
if the arrow on the drive assembly turn in the right direction (fig.6).