Page | 25
Verve LED
Step 8:
Fix all the screws front and back side on the Head Plate, as shown below:
Fig 24: Mounting Print Heads
Step 9:
Connect ink inlet pipes to the sub tanks (Refer to Fig 24).
Step 10:
Connect the Head cable connector to the Head I/O Board (Refer to Fig 24).
Step 11:
Connect one end of the head cable to the Head I/O board and another to the Head board in the
given slot. While connecting Head Cable to Head Board, please match the Head Cable Slot Number to the
TCS information provided in the Print Control Centre.
To get TCS information, click on the
Maintenance
→
Voltage
tab, as show below:
Fig 25: Displaying the TCS Information
Head Alignment Screws
Summary of Contents for VerveLED VLR 2513
Page 1: ......
Page 49: ...Page 48 Verve LED...