7. PRODUCT OPERATION.
7.1. For general use
,
it is recommended this product be operated with an E
lectrothermal MC5
Controller
(Energy Regulator).
Overview of Bunsen
7.2.
Use with MC 5 Controller. (BA6101/C).
7.2.1. Couple the output IEC socket from the MC controller to the IEC plug of the
Bunsen.
7.2.2. Check the data plate voltage conforms to local supply. Connect the MC
controller to the mains electricity supply.
7.2.3. Rotate the regulator knob to increase power to the Bunsen. This will increase
the operating temperature. The White neon on the MC 5 controller will indicate
the presence of mains electricity. The Amber neon will pulse as the controller
applies power indicating when mains electricity is being supplied to the Bunsen.
(Refer to MC 5 controller Instructions
manual
for complete operation).
Item Description
1
2
3
4
5
Mains input cord set.
With Male IEC socket.
Warning labels.
(Hot surface and refer
to this Instructions
Manual
).
Cowl.
Data Plate:- Located on underside of
product.
(Refer to for correct input
mains supply voltage).
Earth continuity test point
10