![Coffee Queen CAFE ELITE Technical Manual Download Page 13](http://html.mh-extra.com/html/coffee-queen/cafe-elite/cafe-elite_technical-manual_2634442013.webp)
CAFÉ ELITE
13
INSTALLATION AND START-UP
Fill ingredient canisters
Open the door.
Reassembly canisters.
When placing the ingredient canisters, Ensure
that the openings of the canister chutes point
down toward the mixing bowl (B).
01
02
B
B
Remove the ingredient canisters to avoid spilling
in the machine and fill with ingredients .
When filling the ingredients, keep the opening of
the canister chute upwards (A).
03
A
Summary of Contents for CAFE ELITE
Page 1: ...TM_EN Part No 1740056_02 CAFÉ ELITE TECHNICAL MANUAL ...
Page 40: ...CAFÉ ELITE 40 EXPLODEDVIEW Door Drawing 01 02 03 04 16 13 14 08 09 10 11 05 06 15 07 12 ...
Page 50: ...CAFÉ ELITE 50 EXPLODEDVIEW Canister Drawing 01 02 03 04 05 09 10 06 08 07 ...
Page 52: ...CAFÉ ELITE 52 CIRCUIT DIAGRAM High Current ...
Page 53: ...CAFÉ ELITE 53 CIRCUIT DIAGRAM High Current 3 phase ...
Page 54: ...CAFÉ ELITE 54 CIRCUIT DIAGRAM IO Board Outputs HOT WATER MIXER 2 ...
Page 55: ...CAFÉ ELITE 55 CIRCUIT DIAGRAM Ucmerisc and IO pay board ...