6. Routine Maintenance
The equipment is designed to keep the levels of maintenance to an absolute
minimum.
6.1. Cleaning Windows
It is important that the optical windows of both the transmitter and the receiver
be kept reasonably clean and any mounting tubes free from build-up of dust and
fly ash. This can be accomplished by removing the transmitter and receiver and
wiping their windows with a soft, dry cloth. If the windows are cleaned, a
calibration is advised afterwards.
6.2. Clean Flue Condition Available
Should a clean flue condition become available and the instrument was
commissioned with an opacity offset, it is recommended that a calibration be
conducted to take advantage of this situation.