45
4. DISASSEMBLING AND SERVICING
PIN
(
10×14
)
CYLINDER HEAD
Installation
:
Before installation, remove any carbon
deposits from the combustion chamber and
inspect the valve seats. Measure the
cylinder compression after reassembly.
GASKET
SPARK
PLUG
BOLT
(M8×50)
Loosen and tighten the
bolts in a crisscross
pattern in 2 or 3 steps.
CYLINDER
GASKET
HEAD COVER
BOLT
(M6
×
14)
Apply oil to thread
Loosen and tighten the bolts in a
crisscross pattern, especially tightening,
uniformly and gradually tighten, finally
to the specified torque.
Torque
:
8N.m
Summary of Contents for Y173V
Page 4: ......
Page 8: ...2 DIMENSION AND TORQUE 4 2 DIMENSION AND TORQUE 2 1 Dimension ...
Page 48: ...46 4 DISASSEMBLING AND SERVICING INTAKE VALVE Reassembly ...
Page 64: ...4 DISASSEMBLING AND SERVICING 4 5 Electric Diagrams ...
Page 65: ...61 appendix TRANSFORMATION POINTS Engine Cover SHROUD Recoil Starter ...
Page 66: ......