14
Step Twelve
: Perform an Operational Check. Proceed to Page 21 of this manual for instructions on how to
perform an operational check.
Step Thirteen:
Install the Ionizer (this step is optional if you have the Cedar Wood option, as Cedar is naturally
anti-bacterial). When you look inside your sauna, you will see a black wire hanging down from the top left
side of the ceiling. Screw the Ionizer vertically below the wire, as seen in the picture below. Note that the disk
on the back of the Ionizer can stay in the “on” position. Refer to “how-to-use” instructions on page 21 for
operation.
Step Fourteen
: Slide the sauna into the desired location (if applicable).
Summary of Contents for Delmar
Page 20: ...20 Control Panel Instructions ...