
19
Step Twelve:
Install the Ionizer. When you look inside your sauna, you will see a black wire hanging down
from a side wall. Screw the Ionizer horizontally below the wire, as seen in the picture below. Note that the
disk on the back of the Ionizer can stay in the “on” position.
Step Thirteen
: Perform an Operational Check. Proceed to the next page for how to operate your sauna.
Summary of Contents for Delmar Series
Page 20: ...20 Control Panel Instructions ...
Page 22: ...22 Step Fourteen SWEAT ...