background image

C (G)-310 Main Frame Connector 

- 11

 

  

comtestnetworks.com

 

8.2 Jumper field

: The connector panel is 

permanently pre-marked in black numbers, with a 

vertical black dividing line, adjacent to every 10 

pairs of wire-wrap terminals on the right face of 

the panel, to assist in quick pair identification 

when placing CO jumpers (Figure 12). 

8.3 Fanning strip

: The fanning strip with holes 

for entrance of the CO jumpers is on the front of 

the panel immediately to the right of the wire-wrap 

terminals. Each group of 10 cable pairs has two 

large fanning strip holes to facilitate access of the 

jumper wires from line terminal blocks to the 

connector wire-wrap terminals (Figure 13). The 

side of the fanning strip is also marked for 10 

pairs. 

8.4 Connection of Central Office to Outside 

Plant: 

All that is required to make the final 

connection is to push each protector module from the 

detent position to the fully inserted position. The 

outside plant and central office equipment are then 

connected. 

Summary of Contents for C(G)-310

Page 1: ...re addresses stubbed connectors the second addresses stubless connectors 2 Description 2 1 The C G 310 connector consists of a connector base designed for installation on a main distributing frame MDF...

Page 2: ...iven in Section 6 for Changing Stub Position If there are fanning strips on the frame vertical remove them The C G 310 connector fanning strip is an integral part of the connector panel Mark the cable...

Page 3: ...connector to the 1 4 20 terminal on the main frame copper ground bar using the long 28 inch ground strap 5 4 Isolated ground method Remove the short 3 1 2 inch ground strap from the no 10 screw groun...

Page 4: ...C G 310 Main Frame Connector 4 comtestnetworks com...

Page 5: ...e molded end of the cable stub above the top of the connector base before using this method 6 1 2 Remove cable clamps from pressure plug and mounting bar 6 1 3 Turn cable stub 180 degrees 6 1 4 Reinst...

Page 6: ...ket Figure 7 Set the base aside and save screws 7 2 2 Mount the temporary mounting brackets to the mounting bracket on the frame by using the four 4 8 32 screws provided Use the small temporary mounti...

Page 7: ...C G 310 Main Frame Connector 7 comtestnetworks com...

Page 8: ...C G 310 Main Frame Connector 8 comtestnetworks com...

Page 9: ...C G 310 Main Frame Connector 9 comtestnetworks com...

Page 10: ...r grounding splicing and changing stub positions given in Sections 5 and 6 NOTES 1 Test Field 100 Tip Ring pair test receptacles 50 at top and 50 at the bottom of the connector base 2 Connector Field...

Page 11: ...the CO jumpers is on the front of the panel immediately to the right of the wire wrap terminals Each group of 10 cable pairs has two large fanning strip holes to facilitate access of the jumper wires...

Page 12: ...C G 310 Main Frame Connector 12 comtestnetworks com...

Reviews: