background image

C (G)-310 Main Frame Connector 

- 10

 

  

comtestnetworks.com

 

7.4 

When wiring has been completed, remove 

the temporary mounting brackets and reassemble 

the connector base to its regular mounting bracket. 

Be sure to reconnect the short ground strap between 

the no. 10 screw ground terminal on the connector base, 

and the screw on the mounting bracket (Figure 4). 

7.5 

After the connector has been stubbed, 

complete the installation by following the 

instructions for grounding, splicing, and changing 

stub positions given in Sections 5 and 6. 

NOTES: 

1. Test Field - 100 Tip/Ring pair test receptacles, 50 at

top and 50 at the bottom of the connector base.

2. Connector Field - Receptacles for 100 connector

modules.

3. Jumper Field - 100 Tip/Ring pair wire-wrap terminals

adjacent to integral fanning strip.

8. Marking and Jumpering

8.1 Test fields

: Each connector panel test field

is permanently pre-marked in black numbers in

increments of five pairs (Figure 12). Each pair of

test contacts has tip-left and ring-right. A space is

provided immediately above the bottom test field

to mark the cable number and pair count (Figure

12).

Summary of Contents for C(G)-310

Page 1: ...re addresses stubbed connectors the second addresses stubless connectors 2 Description 2 1 The C G 310 connector consists of a connector base designed for installation on a main distributing frame MDF...

Page 2: ...iven in Section 6 for Changing Stub Position If there are fanning strips on the frame vertical remove them The C G 310 connector fanning strip is an integral part of the connector panel Mark the cable...

Page 3: ...connector to the 1 4 20 terminal on the main frame copper ground bar using the long 28 inch ground strap 5 4 Isolated ground method Remove the short 3 1 2 inch ground strap from the no 10 screw groun...

Page 4: ...C G 310 Main Frame Connector 4 comtestnetworks com...

Page 5: ...e molded end of the cable stub above the top of the connector base before using this method 6 1 2 Remove cable clamps from pressure plug and mounting bar 6 1 3 Turn cable stub 180 degrees 6 1 4 Reinst...

Page 6: ...ket Figure 7 Set the base aside and save screws 7 2 2 Mount the temporary mounting brackets to the mounting bracket on the frame by using the four 4 8 32 screws provided Use the small temporary mounti...

Page 7: ...C G 310 Main Frame Connector 7 comtestnetworks com...

Page 8: ...C G 310 Main Frame Connector 8 comtestnetworks com...

Page 9: ...C G 310 Main Frame Connector 9 comtestnetworks com...

Page 10: ...r grounding splicing and changing stub positions given in Sections 5 and 6 NOTES 1 Test Field 100 Tip Ring pair test receptacles 50 at top and 50 at the bottom of the connector base 2 Connector Field...

Page 11: ...the CO jumpers is on the front of the panel immediately to the right of the wire wrap terminals Each group of 10 cable pairs has two large fanning strip holes to facilitate access of the jumper wires...

Page 12: ...C G 310 Main Frame Connector 12 comtestnetworks com...

Reviews: