C (G)-310 Main Frame Connector
- 6 –
7. Installing Stubless Connectors
7.1
Attach the C–310 connectors to the left side
of the distributing frame vertical mounting bar,
beginning at the lower end of the frame (Figures 2
and 3). Use the 1/4-20 mounting screws furnished
with the connectors. Place the top screw in the
vertical mounting bar on the MDF. Hang the
connector on this screw using the keyhole slot on
the C–310 mounting bracket. Now install the lower
screw into the bracket and frame and tighten both
screws.
7.2
Temporary Mounting
7.2.1
Remove the four (4) 8-32 screws holding the
plastic base to the mounting bracket (Figure 7).
Set the base aside and save screws.
7.2.2
Mount the temporary mounting brackets to
the mounting bracket on the frame by using the
four (4) 8-32 screws provided. Use the small
temporary mounting bracket on top and the large
temporary mounting bracket on bottom (Figure 7).
7.2.4
Attach plastic connector to temporary
mounting bracket with the screws saved from step
7.2.1.
7.3.
Wiring
7.3.1
Figure 8, “A” application, describes hard
wiring central office equipment to connector
central office terminals for outside plant cable
cross-connected at a jumper field.
7.3.2
Figure 9, “B” application, describes central
office equipment cross-connected at jumper field
for outside plant cable hard wired at test field or to
connector outside plant terminals.
7.3.3
Refer to the wiring diagram table (Figure 10)
and Figure 11 to stub connector.
Summary of Contents for C(G)-310
Page 4: ...C G 310 Main Frame Connector 4 comtestnetworks com...
Page 7: ...C G 310 Main Frame Connector 7 comtestnetworks com...
Page 8: ...C G 310 Main Frame Connector 8 comtestnetworks com...
Page 9: ...C G 310 Main Frame Connector 9 comtestnetworks com...
Page 12: ...C G 310 Main Frame Connector 12 comtestnetworks com...