Installation
Electrical Connection
(continued)
A
B
Fig. 6
GROUND LUG
STRAIN-RELIEF
KNOCKOUT
B
A
3
Fig. 7
L1
L2
N
L1
L2
NEUTRAL
208/240V
115V
115V
G
Fig. 8
4
REMOVE THE LEFT SCREW ON THE
FRONT LIP OF THE TERMINAL BOX.
LIFT AND REMOVE THE COVER
TO ACCESS THE TERMINAL BLOCK.
A
B
A 30" / 76 cm SERVICE
LOOP MUST BE PROVIDED
BEHIND THE UNIT FOR
SERVICING.
STOP
STOP
THREAD THE POWER CABLE
THROUGH THE MIDDLE
SLOT IN THE REAR PANEL.
SECURE THE CABLE TO THE
TERMINAL BOX USING THE
PROPER STRAIN RELIEF.
A
B
208-240V / 60Hz / 1
Ø
115V SPLIT CONNECTION
SINGLE PHASE - THREE WIRE PLUS GROUND
WHICH INCLUDES A CURRENT CARRYING
NEUTRAL WIRE RATED MIN 190
°
F (88
°
C).
CONNECT THE INCOMING
POWER AS SHOWN IN FIG. 8.
8
2
TERMINAL
ENCLOSURE
Summary of Contents for UC65e M3
Page 26: ...Timing Chart 21...
Page 27: ...21 SINGLE PHASE 22 UC65e M3...