48
00001996 (REV AC) 627NH
October 2014
which if worn or damaged may cause premature failure
of the new chain. Parts can be easily identifi ed by
referring to pages Parts List section of table of contents.
e.
If the liftwheel pockets, in particular the ends, are worn
or scored, replace liftwheel. If chain guides and housing
are worn, cracked or damaged these parts should also
be replaced.
f.
Reassemble hoist with the new load chain inserted over
the liftwheel. Position chain with the weld on up standing
links away from liftwheel and leave only one foot of chain
hanging free on loose end side. Make sure the last chain
link is an upstanding link. On double reeved models,
make sure that the new load chain has an even number
of links. On triple reeved models, make sure that the
new chain has an odd number of |inks. This will prevent
twist in chain. To simplify handling when reassembling
the hoist, a short undamaged piece of the old chain may
be used as a “starter chain”. Position this piece of chain
in exactly the same manner as explained above for the
“new chain”, and complete the reassembly of the hoist.
g.
Attach the loose end link to chain and connect it to the
hoist frame with the loose end screw, washer and lock
washer, see Figure 7.
BE CERTAIN THERE IS NO TWIST.
CAUTION: For double reeved models, be sure to
disconnect one of the loose end links from the load chain
before attaching it to the hoist.
h.
For single reeved models, attach the hook block to load
chain and proceed to step K.
i.
For double reeved models, run the hoist (UP) until only
3 feet (.9 m) in chain remains on dead end side. This
will minimize the chance of introducing a twist between
hook block and hoist. Allow the chain to hang free to
remove twists. Using a wire as a starter, insert the chain,
fl at link fi rst, into lower hook block (upstanding links will
have weld toward sheave) and pull through. Insert last
link into slot in dead end block making sure that no twist
exists in the reeving at any point. Assemble dead end
pin, washer and cotter pin as shown in Figure 7.
j.
Using a wire as a starter, insert the chain, fl at link fi rst,
into lower hook block (upstanding links will have weld
toward sheave) and pull through. Insert last link into slot
in dead end block making certain that no twist exists in
the reeving at any point. Assemble dead end pin, washer
and cotter pin as shown in Figure 7.
k.
Adjust limit switches as described in Table 6, page 22.
If the new chain is longer than the old, check to be sure
limit switch will allow for new length of lift. In the event
maximum adjustment does not allow entire length of lift,
check with CM
®
for modifi cation if necessary.
l.
For triple reeved models, run the hoist (UP) until only
4 feet (1.2 m) of chain remains on the dead end side.
This will minimize the chance of introducing a twist
between the hook block and hoist. Allow the chain to
hang free to remove twists. Using a wire as a starter,
insert the chain, upstanding link fi rst, into lower hook
block (upstanding links will have welds toward sheave)
and pull through. Using a wire as a starter, insert the
chain, upstanding link fi rst, into the outboard cloverleaf
of the hanger. Make sure there are no twists between
the hook block and then pull the chain through. In the
sheave hanger, the up standing links will have the welds
toward the sheaves. Run the chain down to the hook
block and making sure there are no twists between the
sheave hanger and the hook block, insert the end of the
chain into the recess in the top of the hook block. Slide
the dead end screw, with fl at sides vertical, through
the hole in the top of the hook block. Place the lock
washer and nut on the threaded end of the dead end
screw. Use an Allen wrench to hold the head of the dead
end screw stationary and rotate the nut to tighten. To
properly tighten the nut, apply a torque of 45 (61N•m) to
55 pound feet (74.6 N•m) while holding the head of the
dead end screw stationary. Also, when tightening this
dead end screw, it should be held fi rmly in position and
torqued from the nut end to avoid damaging the screw
and/or chain.
Do not allow hook block to hit hoist or allow load chain to become
taut between loose end screw and frame or else serious damage
will result. If hook block should inadvertently hit the hoist-the
hoist frames, load chain and hook block should be inspected for
damage before further use.
Method #2
Treat the old load chain in hoist as a “starter chain” and
proceed with steps from Method #1, a, b, c and h thru k. If
a starter chain is used, the loose end link (two links required
for double reeved models) can serve as a temporary coupling
link to connect together the starter chain in the hoist and
the new load chain to be installed. Then, under power, reeve
the new load chain through the liftwheel area, replacing the
starter chain in unit. Run enough chain through to attach
loose end link to hoist frame.
Method #3
a. First proceed with Steps 1a, b & c from Method #1.
b. Then, carefully run the load chain out of the hoist.
c. Disconnect hoist from power supply.
d. Remove the electric brake assembly.
e.
Rotate the brake hub by hand, at the same time feeding
the load chain into and through liftwheel area with hoist
upside down or using a wire to pull the load chain up
onto the liftwheel as explained in Method #1 step 1f.
f.
Refer to Method #1 steps g thru j above to complete
the installation.
Summary of Contents for Lodestar A
Page 31: ...31 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 32: ...32 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 33: ...33 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 34: ...34 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 35: ...35 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 36: ...36 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 37: ...37 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 38: ...38 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 39: ...39 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 40: ...40 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 41: ...41 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 42: ...42 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 43: ...43 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 44: ...44 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 45: ...45 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 46: ...46 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 95: ...95 00001996 REV AC 627NH October 2014 NOTES ...
Page 127: ...31 P N 10001609 REV AB 627NH December 2014 Notes ...