13
00001996 (REV AC) 627NH
October 2014
ATTACHING LOAD CHAIN
RRS & Single.
1. Suspend the hoist from an adequate support.
2. If replacing existing chain, remove chain block kit from
loose end of chain by removing the two (2) screws
from opposing sides of the block. Remove lower hook
assembly by removing the pin holding the chain into the
assembly.
3. Using the connecting link, attach new chain to end of
starter chain (existing chain if replacing) and feed through
chain guides and over liftwheel. Feed enough chain
through to be able to attach the chain block kit to the
loose end of the chain by assembling the screws and
nuts into the appropriate slots and tightening securely.
4. Attach the lower hook assembly to the appropriate end
of the chain, by inserting the end link of the chain into the
block, and securing the link with the pin.
Triple Reeve
1. Suspend the hoist from an adequate support.
2. If replacing existing chain, disconnect “loose end” of
chain by removing the screw holding loose end link in
place on side of hoist frame. Remove dead end of chain
by removing the pin holding dead end link into lower
hook assembly block.
3. Using a connecting link, attach new chain to the “loose
end” of starter chain (existing chain if replacing) and
guide through lower hook block, through upper sheave
hanger and over sheave wheel, through center hole
of plate, and to dead end (center) slot on lower hook
assembly. Make certain load chain is free from twists and
binds.
4. Place dead end link into dead end slot, and insert pin.
Attach loose end link to frame of hoist, using the provided
screw. Tighten all fasteners securely.
To attach the chain to the dead end block on Models E,
E-2, H, H-2, R, R-2 and RR-2, proceed as follows:
1. Suspend the hoist from an adequate support.
2. On Models E, E-2, H and H-2, insert the last link of the
load chain into the dead end block (1) and secure it with
the dead end pin, washer and cotter pin furnished with
the suspension. Ensure there are no twists in the chain.
3. On Models R, R-2, RR and RR-2, slide the contact block
up the chain until it is against the bottom of the hoist
and the dead end block is projecting through the square
opening in the bottom of the block. Insert the last link of
the load chain, making sure there are no twists between
the hook block and the dead end block, into the dead
end block. Push the contact block up slightly and secure
the load chain to the dead end block using the dead end
pin, washer and cotter pin furnished with the suspension.
The dead end pin also supports the contact block (See
Figure 8)
Figure 8. Contact Block Used on Models R, R-2, RR and RR-2
Do not remove the plastic ties from the load chain at this
time. After the suspension is installed, hoists with a hook
suspension can be suspended from its permanent support
and then connected to the power supply system (refer to
page 14). For hoists with a lug suspension that are to be
suspended from a Series 635 Low Headroom Trolley, attach
the hoist to the trolley per the following instructions.
Summary of Contents for Lodestar A
Page 31: ...31 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 32: ...32 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 33: ...33 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 34: ...34 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 35: ...35 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 36: ...36 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 37: ...37 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 38: ...38 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 39: ...39 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 40: ...40 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 41: ...41 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 42: ...42 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 43: ...43 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 44: ...44 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 45: ...45 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 46: ...46 00001996 REV AC 627NH October 2014 REFERENCE WIRING DIAGRAMS ...
Page 95: ...95 00001996 REV AC 627NH October 2014 NOTES ...
Page 127: ...31 P N 10001609 REV AB 627NH December 2014 Notes ...