6 - START-UP
PRELIMINARY CHECKS
To check
before
starting-up the unit .
For details refer to the different manual sections.
√
Preliminary checks - Unit OFF power supply
Access in safety
Functional clearances
Structure integrity
Unit on vibration isolators
Unit input water shut-off valves for cleaning
Vibration isolators on water connections
Expansion tank (indicative volume = 5% system content)
Cleaned system
Loaded possibile glicole so corrosion inhibitor
Under pressure system
Vented system
Refrigerant circuit visual check
Earthing connection
Power supply features
Electrical connections provided by the customer
Outside air temperature probe
Summary of Contents for WSH 100D
Page 9: ...9 4 WATER CONNECTIONS...
Page 12: ...12 WATER CONNECTIONS...
Page 14: ...14 5 ELECTRICAL CONNECTIONS 5 6 CONNECTIONS PERFORMER BY CUSTOMER...
Page 15: ...15 5 ELECTRICAL CONNECTIONS...
Page 16: ...16 5 ELECTRICAL CONNECTIONS...
Page 31: ...31 8 MAINTENANCE...
Page 46: ...46 NOTE...
Page 47: ...47...