5 - WATER CONNECTIONS
Victaulic connections
1 take away the supplied connection union by acting on the
connection joint
2 weld the union to the installation pipe
3 perform the connection between the installation pipe and the
evaporator, using the joint
Do not weld the system pipe with the Victaulic connection joint
attached.
The rubber gasket might be irreparably damaged.
Operations sequence
Before starting the unit pump:
1 Close all vents in the high points of the unit’s water circuit.
2 Close all drain shut-off valves in the low points of the unit’s
water circuit
Exchangers
Pumps
collectors
storage tanks
Thoroughly wash the system with clean water:
use the bypass to exclude the exchanger from the flow
(diagram on previous page) fill and drain the system several
times.
Apply additives to prevent corrosion, fouling, formation of mud
and algae.
Fill the system
do not use the unit pump
Conduct a leak test.
Isolate the pipes to avoid heat dispersions and formation of
condensate.
Leave various service points free (wells, vents, etc).
Neglecting to wash will lead to the filter having to be cleaned
many times and at worst may damage the exchangers and
compressors.
Victaulic