Operations sequence
Before starting the unit pump :
1. Close all vents in the high points of the unit’s water
circuit.
2. Close all drain shut-off valves in the low points of
the unit’s water circuit:
Exchangers
Pumps
manifolds
storage tanks
Thoroughly wash the system with clean water:
use the bypass to exclude the exchanger from
the flow (diagram on previous page) fill and
drain the system several times
Apply additives to prevent corrosion, fouling,
formation of mud and algae.
Fill the system
Conduct a leak test.
Isolate the pipes to avoid heat dispersions and
formation of condensate.
Leave various service points free (wells, vents, etc).
Neglecting to wash will lead to the filter having to
be cleaned many times and at worst may damage
the exchangers and other parts
Summary of Contents for WSAN-XES 18.2
Page 7: ...7 WSAN XES 18 2 35 2 M0SM40N17 04 ...
Page 10: ...10 WSAN XES 18 2 35 2 M0SM40N17 04 Protection grilles Option PESM00007 PESM00008 ...
Page 18: ...18 WSAN XES 18 2 35 2 M0SM40N17 04 Connections by the Customer ...
Page 21: ...21 WSAN XES 18 2 35 2 M0SM40N17 04 UNITS IN MODULAR CONFIGURATION ...