Page 28
FF6300 Operating Manual
The machine can be broken down quickly into more manageable sections if needed.
3.4
S
ETUP
OVERVIEW
FOR
THE
ID
CHUCK
MACHINE
Inspect and perform necessary maintenance on the machine before mounting on a
workpiece. The following steps are an overview of the processes involved with setting
up the FF6300 in the ID mounting configuration. The OD mount setup is listed in
Section 3.7 on page 36
To set up the FF6300 ID chuck, follow the process below. For details on these steps,
see Section 3.6 on page 32 through Section 3.12 on page 48.
To mount the machine to the workpiece:
1. Check that power sources are disconnected.
2. Measure the bore diameter. Use
the setup chart in Table 3-1 on
page 33 to select leg sections of
the correct length.
3. Assemble the ID chuck (Figure
F
IGURE
3-2. M
EASURE
THE
FLANGE
F
IGURE
3-3. A
SSEMBLE
THE
ID
CHUCK
Summary of Contents for FF6300
Page 2: ......
Page 4: ...Page B FF6300 Operating Manual CLIMAX GLOBAL LOCATIONS...
Page 5: ...P N 80679 Rev 10 Page C CE DOCUMENTATION...
Page 10: ...Page iv FF6300 Operating Manual This page intentionally left blank...
Page 14: ...Page viii FF6300 Operating Manual This page intentionally left blank...
Page 16: ...Page x FF6300 Operating Manual This page intentionally left blank...
Page 21: ...P N 80679 Rev 10 Page 5 This page intentionally left blank...
Page 28: ...Page 12 FF6300 Operating Manual This page intentionally left blank...
Page 31: ...P N 80679 Rev 10 Page 15 2 1 1 ID chuck assembly FIGURE 2 1 ID CHUCK ASSEMBLY...
Page 33: ...P N 80679 Rev 10 Page 17 2 1 3 OD mount assembly FIGURE 2 3 OD MOUNT ASSEMBLY...
Page 40: ...Page 24 FF6300 Operating Manual This page intentionally left blank...
Page 71: ...P N 80679 Rev 10 Page 55 FIGURE 3 44 BACKFACING ATTACHMENT DIMENSIONS...
Page 72: ...Page 56 FF6300 Operating Manual This page intentionally left blank...
Page 88: ...Page 72 FF6300 Operating Manual This page intentionally left blank...
Page 90: ...Page 74 FF6300 Operating Manual FIGURE 6 1 FF6300 IN CONTAINERS STEEL CONTAINER WOODEN CRATE...
Page 92: ...Page 76 FF6300 Operating Manual FIGURE 6 3 PACKING THE FF6300 WITH OD MOUNT...
Page 94: ...Page 78 FF6300 Operating Manual This page intentionally left blank...
Page 99: ...P N 80679 Rev 10 Page 83 This page intentionally left blank...
Page 126: ...Page 110 FF6300 Operating Manual This page intentionally left blank...
Page 129: ...P N 80679 Rev 10 Page 113 APPENDIX C SDS Contact CLIMAX for the current Safety Data Sheets...
Page 130: ...Page 114 FF6300 Operating Manual This page intentionally left blank...
Page 131: ......
Page 132: ......