
P/N 95936, Rev. 0
Page 25
3
SETUP
IN THIS CHAPTER:
3.1 R
ECEIPT
AND
INSPECTION
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -25
3.2 L
IFTING
AND
RIGGING
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -25
3.3 M
ACHINE
ASSEMBLY
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -28
3.3.1 FF1200: D
ETERMINING
THE
CHUCKING
RANGE
- - - - - - - - - - - - - - - - - - - - - - - - - -28
3.3.2 FF2400: D
ETERMINING
THE
CHUCKING
RANGE
- - - - - - - - - - - - - - - - - - - - - - - - - -29
3.3.3 FF3600: D
ETERMINING
THE
CHUCKING
RANGE
- - - - - - - - - - - - - - - - - - - - - - - - - -30
3.3.4 A
TTACHING
THE
CHUCKING
FEET
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -31
3.3.5 M
OUNT
THE
CHUCK
TO
THE
WORKPIECE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -32
3.3.5.1 L
EVEL
THE
RDU - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -39
3.3.5.2 RDU
CENTERING
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -40
3.3.6 I
NSTALL
THE
SLIDE
ASSEMBLY
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -41
3.3.7 I
NSTALL
OR
REPLACE
THE
CUTTING
TOOL
- - - - - - - - - - - - - - - - - - - - - - - - - - - -42
3.3.8 I
NSTALL
THE
MOTOR
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -43
3.3.9 S
ET
UP
THE
PCU - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -44
3.4 M
ACHINE
CONFIGURATION
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -44
3.4.1 S
ET
THE
TOOL
CUTTING
DEPTH
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -45
3.4.2 T
ILT
THE
AXIAL
SLIDE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -45
3.4.3 T
ILT
THE
RADIAL
SLIDE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -47
3.1
R
ECEIPT
AND
INSPECTION
Your CLIMAX product was inspected and tested prior to shipment, and packaged
for normal shipment conditions. CLIMAX does not guarantee the condition of
your machine upon delivery. When you receive your CLIMAX product, perform
the following receipt checks.
1. Inspect the shipping containers for damage.
2. Check the contents of the shipping containers against the included invoice
to make sure that all components have been shipped.
3. Inspect all components for damage.
Contact CLIMAX immediately to report damaged or missing components.
3.2
L
IFTING
AND
RIGGING
Before lifting, make sure all parts are securely attached to the rotational drive unit
(RDU).
Summary of Contents for FF1200
Page 2: ......
Page 4: ...Page B FF1200 FF2400 FF3600 Operating Manual CLIMAX GLOBAL LOCATIONS ...
Page 5: ...P N 95936 Rev 0 Page C CE DOCUMENTATION ...
Page 12: ...Page 4 FF1200 FF2400 FF3600 Operating Manual This page intentionally left blank ...
Page 14: ...Page 2 FF1200 FF2400 FF3600 Operating Manual This page intentionally left blank ...
Page 24: ...Labels Page 10 FF1200 FF2400 FF3600 Operating Manual This page left intentionally blank ...
Page 120: ...Page 106 FF1200 FF2400 FF3600 Operating Manual This page intentionally left blank ...
Page 122: ...Page 108 FF1200 FF2400 FF3600 Operating Manual This page intentionally left blank ...
Page 123: ...P N 95936 Rev 0 Page 109 APPENDIX C SDS Contact CLIMAX for the current safety data sheets ...
Page 124: ...Page 110 FF1200 FF2400 FF3600 Operating Manual This page intentionally left blank ...
Page 125: ......
Page 126: ......