Chassis Pre-Installation
1. Check chassis data plate. Verify chassis is correct for
cabinet. Chassis I.D. sticker should match sticker on
cabinet blower housing.
2. Check for any shipping or handling damage. Make
repairs or adjustments.
a. Verify refrigerant tubing is free of kinks or dents and
that it does not touch other tubes or unit parts as it
passes over or through. Adjust if needed and separate
with closed cell insulation.
b. Inspect insulation inside compressor enclosure for
rubs from tubing or reversing valve. Adjust tubing
or RV inward if needed. Be careful not to cause hit
somewhere else.
3. Inspect all electrical connections. Connections must
be clean and tight at the terminals.
4. Replace any panels or covers removed for steps 2-4.
The chassis is now ready for installation. Always keep
chassis upright.
Figure 17
Figure 15
Figure 16
Figure 18
CXM/
DXM2
Transformer
Water High
Pressure Switch
RV
TXV
NPSH (BPPT)
Male Fitting for
AHH Hose
Filter Drier
Chassis
Data
Plate
Compressor
Enclosure
Compressor
Coaxial
Water/Ref
Coil
Compressor
Capacitor
Pressure
Switches
Enclosure
Removed
Control Box
Cover Removed
See Figures 15-18
Electrical Connections
3 - PIN (Line Voltage)
5 - PIN (Motor)
9 - PIN (Thermostat)
Return
(Water Out)
Supply
(Water In)
Contactor
(Optional RIB relay
location 09-18)
Wire Diagram
(on back)
CXM
Test Button
DXM2
Service Tool
Port
Board Flash
Code Window
Control Box
Cover
Chassis Model and Serial
Number Sticker
RV
sor
f
Pre
Sw
Enclosure
R
d
I.D.
Label
(Match to
Cabinet)