CLiC-iT A4 User Instruction Download Page 11

11

Physical: Design of the park, PPE choice

Operational: Fitting PPE to the user, training of the staff, briefing, supervision, quality of

rescue / evacuation.

Design of the park

The height of the lifeline must be evaluated in the entire park in order to ensure that the

length of the lanyard is appropriate throughout the park. Varying heights can lead to

incompatibilities and therefore bear risks.

When climbing using a vertical lifeline, (fall-stop, Tarzan’s swing…), the anchor point

must either be fixed to the harness attachment point or be connected to the lanyards,

avoiding that the two lanyards be tensioned in the event of a fall.

Life safety systems should limit a user's fall to less than 50 cm (20 inches).

According to the lifeline height & to the size of the user, we propose following

recommendations: see point 4.1

Handles are recommended on all the game to eliminate the need for users to grab the

lanyards. Lifelines should be installed to minimize obstruction of a user’s head, for

example on the side.

Choosing PPE (see 4.1.2)

It is recommended that the central point of CLiC-iT lanyard be attached with the shortest

possible distance to the user’s harness clip-in point. A low clip-in point of the lanyard on

the harness is strongly recommended to decrease the risk of neck entrapment.

It must be considered that helmets may make it more difficult to extricate one’s head

from between the lanyard legs.

Fitting of PPE to the user

The correct harness and lanyard length must be chosen individually to fit each partici

-

pant

correctly.

Harness must be put on properly and double checked.

Adjustments to the harness leg loops are necessary to prevent the harness clip-in point

from sliding upwards in the case of a fall. This harness rise should be taken into conside

-

ration

and planned for.

The user should be instructed on proper harness fit and to ask a guide if something feels

wrong. It should be forbidden for participants to put on the harness on their own.

Training of the staff

All staff members must be aware of their responsibilities in order to establish a safe

environment. They must be properly trained in assist and rescue techniques as well as in

briefing and coaching methods.

All staff must receive professional training regularly in which all information for the

proper operation of the park is conveyed.

Assessments of the staff’s ability to perform competent rescue procedures and conduct

proper and complete guest briefings must be done on a regular basis.

The Awareness of all involved risks throughout the park must be raised within your 

instructor

and rescue team. The staff must know all possible dangers associated with using

life safety systems and how different components interact with each other.

A helpful and supportive attitude towards the guests is important.

Briefing

The instructions must be passed on to each user on how to use all the equipment and

practice handling it on the ground before climbing. Awareness of all risks must be

raised. The user must be informed to refrain from placing his/her head between the

lanyard legs.

The user should be encouraged to push the lanyard forward him/her on the cable so

that the lanyard stays in the front of the body and the user's head remains away from

lanyards.

Carabiners should only be attached to the designated lifelines.

Supervision

The staff team must be vigilant, have taken part in the training process and is required to

have experience in supervising the course.

Good supervision covering all parts of the course must be ensured.

The rescue team must be prepared and capable of reacting quickly in case of emergency

and have good and fast access to all parts of the course. All instructors should carry a

system or device for lifting, not just rescuers or rescue teams.

Participants who faced difficulties during the briefing must be given additional attention

and helped, verbally or physically, if needed.

Participants should not be left alone on a course.

Enhanced supervision must be in place where the participants are faced with special

circumstances (zipline, Tarzan swing, etc).

Please note

The list of recommendations stated here above is only to be used as a general guideline

to limit the risks involved with climbing in adventure parks. This guideline is by no

means exhaustive. It should be taken into consideration and validated by park builders

and operators and shall continuously be expanded in accordance with feedback and

experiences.

To minimize the inherent risks involved when climbing and using personal protective 

equipment, it is the responsibility of all involved parties to ensure a safe park design, a 

thorough briefing for users,

the compatibility between all products, the correct use of the safety equipment and to

provide appropriate training for their staff in order to supervise the operation (this list is 

not exhaustive with the practice of the ropes course).

Summary of Contents for A4

Page 1: ... Longueur B Length B Identification de l équipement Equipment identification sheet Exemple de référence Example of reference Modèle Model CLiC iT ADVENTURE 1 1 Type de longe Type of lanyards 1 2 Détection d ancrage Anchor detection C ZAM L Câble Cable 1 OK OK 2 OK NO ZiP A 6 25 2 55 mm 2 1 58 mm 2 3 1 3 Connecteur CLiC n ZiP CLiC n ZiP connector 3 1 2 Maillon rapide inox conforme à EN 12275 MRNl07...

Page 2: ...on label 1 3 4 5 2 3 Utilisation Use 3 1 Fixer un connecteur Attach a connector 3 3 S engager sur une ligne de vie Starting on a route 3 4 Sortir de la ligne de vie Leaving a route 3 2 Ouvrir un connecteur Open a connector 1 2 1 2 1 2 1 2 4 1 4 3 1 1 2 3 2 VERSO 6 1 2 3 4 Connecteur CLiC n ZiP Connecteur CLiC n ZiP Connecteur 25 Connecteur 25 3 2 1 RECTO 2 VERSO 5 2 6 L XXXXX MMAA YY XXXXX XXX EN1...

Page 3: ...3 3 6 Manoeuvres interdites Forbidden maneuvers 1 2 1 2 3 4 6 7 8 9 10 11 12 13 14 3 5 Briefing Briefing 5 ...

Page 4: ...tème CLiC iT Unlocking the CLiC iT system 4 3 Evacuation en cas d urgence Evacuation 4 5 Contrôle du produit Checking the product 1 2 3 5 6 7 9 10 11 C ZAM L C CONNECT CLiC n ZiP C OFF 1 Aimant Magnet B X cf 1 1 L2 B X cf 1 1 Pacemaker A B Variante 1 Variante 2 2 3 X X B L 2 B 4 400m max 8 Ø 16mm max 4 FALL ARREST C UP C ABS QUICKJUMP Assis sitting Debout standing ...

Page 5: ...des connecteurs Cleaning and lubrification of connectors Fabricant Manufacturer DEHONDT SARL Adresse 5 rue des Terres Cellule 7 51420 CERNAY LES REIMS Téléphone 03 26 47 11 34 E mail contact clic it eu La déclaration UE de conformité est disponible sur EU declaration conformity are available on www clic it eu N individuel d identification Individual identification number Examen périodique et histo...

Page 6: ... ouvrir 1 connecteur 1 Fermez le connecteur ouvert sur la ligne de vie 2 Engagez le second connecteur sur une extrémité libre de câble puis ouvrez le second connecteur en appuyant sur sa gâchette 3 Fermez le connecteur sur la ligne de vie Veillez a ce que l utilisateur connecte bien ses deux connecteurs a la ligne de vie au début du parcours 3 4 Sortir de la ligne de vie Procédure a réaliser uniqu...

Page 7: ...utiliser un pistolet a air comprime pression maximum 6 bars Afin d assurer un fonctionnement suave sans grippage et de protéger le système de l humidité pulvériser du lubrifiant BALLISTOL et WD40 à l intérieur du mécanisme Afin d éviter l accumulation de poussière autour de l aimant pulvériser du silicone dans la zone de la bascule 5 Informations complémentaires 1 Température d utilisation Les tem...

Page 8: ...ir un environnement sûr Ils doivent être correctement formés aux techniques d assistance et de sauvetage ainsi qu aux méthodes d information et de briefing Tout le personnel doit recevoir une formation professionnelle régulièrement dans la quelle toutes les informations pour le bon fonctionnement du parc sont transmises Des évaluations de compétence du personnel pour effectuer les procédures de sa...

Page 9: ...leasing the connectors from the cable to be performed only in a safe area Follow the safety instructions applicable to the area in question 1 Unclick the connector 25 by pressing its trigger 2 Click it on the free cable end or on the way out C OFF reference DAS044 Pull it out of the cable end without unclicking it Finally unclick the connector CLiC n ZiP by pressing its trigger 3 5 Briefings 1 Pla...

Page 10: ...ipment should be dried in a dry and ventilated area away from direct heat sources Damp equipment or which has frozen up may not operate properly 6 Storage et transport Store and transport in a cool and dry place away from direct light Avoid unnecessary exposure to UV light Store and transport without any mechanical constraints Store in a ventilated space 7 Maintenance Modification Repair This prod...

Page 11: ...the staff s ability to perform competent rescue procedures and conduct proper and complete guest briefings must be done on a regular basis The Awareness of all involved risks throughout the park must be raised within your instructor and rescue team The staff must know all possible dangers associated with using life safety systems and how different components interact with each other A helpful and ...

Page 12: ... durch Drücken des Sicherungsknopfes 3 Haken ihn auf dem Seil neben dem ersten Karabiner ein Stellen Sie sicher dass der Nutzer am Beginn eines Parcours beide Karabiner richtig am Sicherungsseil einhakt 3 4 Ausstieg am Ende eines Parcours Diese Prozedur darf nur außerhalb jeglicher Absturzgefahrenzone durchgeführt werden Bitte beachten Sie die Sicherheitshinweise für die entsprechende Zone 1 Haken...

Page 13: ...ittels sowie den Zustand der Nähte zwischen dem Wirbel und dem Verbindungsmittel Prüfen Sie den CLiC iT Wirbel gemäß seiner Gebrauchsanweisung Es ist besonders wichtig zu überprüfen dass 1 Die beiden Karabiner auf keinen Fall gleichzeitig entriegelt werden können 2 For Ax1 version the connector 25 can only hook onto a magnetic steel anchor point For Ax2 version the connector 25 can only hook onto ...

Page 14: ...lsweise seitlich Wahl der PSA siehe 4 1 2 Für die Installation des zentralen Punktes des Verbindungsbandes unterhalb des Halses wird empfohlen den zentralen Punkt des Verbindungsbandes an der vorgesehenen Anseilschlaufe des Sicherheitsgeschirrs mit dem kürzest möglichen Abstand zu fixieren Die Nutzung der unteren Anseilschlaufe am Sicherheitsgeschirr ist sehr empfohlen um die Strangulationsrisiken...

Reviews: