3 Basis
3.6 Finishing the roof
Figure 1
(Cabin model 4 serves as example)
Figure 2
Drainage pipe diameter 100 mm
to outside air
(not included with the delivery)
/.A�---Each top bar frame
3 x roof joining bolts
Roof
--
------
- -----------
.....
--------- 1 x bolt M8x30
1 x nut M8
Figure 3
1)
Position the roof in such a way that distance A (fig.2) in front/behind and left/right of the cabin is equal.
2)
Drill 9 mm holes through the holes in the top bar of the frame into the roof flange (fig.2). Drill 3 holes per top bar at
equal distances apart.
3)
Fix the roof flange using bolts as described in fig.3. If the roof rests directly on the top of the door frame, fasten the
roof with polymer cement to the casing.