2
INDEX
ABBREVIATIONS, DEFINITIONS, SYMBOLS AND ICONS
.................................................................... 4
Conventional utilization and restrictions
.................................................................................. 4
No conventional utilisation – Warnings for misuse
................................................................... 4
Operating mode of the complete system
.................................................................................. 5
Media-recovery system (Cyclone)
SET-UP FOR INITIAL INSTALLATION
Unpackung and disposing the packing material
...................................................................... 10
Required space for : BNP 65 and 220
.............................................................................................. 11
Required space: BNP 75 and BNP 85
.............................................................................................. 11
Set-up, assembling and operation checkout
............................................................................ 13
Set up and operation, Shut down
........................................................................................... 14
Shut down by longer interruption of work or moving the cabinet
.............................................. 15
Negative pressure, view, media consumption and flow
..................................................................... 16
Pulsing (cleaning) dust collector cartridge / replace cartridge / disposal of residues
Summary of Contents for BNP 220
Page 29: ...29 8 7 Cyclon pression ...