CLEARSPAN
™
STORAGE MASTER
Revision date: 03.22.19 PB02522R6N1D
Customer-Supplied
Baseboard
1
4
3
2
ATTENTION:
Wrap this upper
cable connection using duct tape
to protect the cover.
CABLE PLACEMENT
The diagram and inserts below identify the placement and
proper way to attach the cable assemblies to the building
using
103856
band clamps.
ALL SIDE CABLE ASSEMBLIES ARE THE SAME LENGTH.
Side Cable
Upper
Cable
ATTENTION:
The side cable positions are identical
for both sides of the frame. All cable assemblies are
positioned at the ends of the frame regardless of the
frame length. Consult the Quick Start diagram for your
shelter for additional details.
All inserts show the circled locations as seen standing
inside the frame.