background image

9

Revision date: 06.04.10

QUICK START GUIDE

30' and 35' Wide End Panels

Quick Start Guide

IMPORTANT:

 Diagrams throughout this manual show the 

end panels installed in line with the outside edge of the 

end rafter legs or ground posts (no sidewall panels).

For buildings that include sidewall polycarbonate panels, 

shift the position of the end panels as needed so these 

panels meet the sidewall panels and create a finished 

corner. Diagrams in this section include sidewalls.

GROUND LEVEL

Panel overlap 

seams.

Panel Kit for 30' 

Wide Frame 

R030B00007

Sidewall 

Panel

Sidewall 

Panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel 

(104621C)

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel: 

cut to fit

Four (4) Upper Panels: Two (2) 50" x 8' 2"

 

(104620C)

 

panels cut and trimmed to fit positions.

GROUND LEVEL

Sidewall 

Panel

Sidewall 

Panel

Top edge of the 

lower panels.

Lower edge of the 

upper panels.

Panel Kit for 35' 

Wide Frame 

R035B00007

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

50" x 12' 2"

 

panel

See Page 11 for upper panels.

50" x 12' 2"

 

panel 

(104621C)

Summary of Contents for R030B00007

Page 1: ...d Reproduction is prohibited without permission STK R030B00007 30 Wide R035B00007 35 Wide ClearSpan Corrugated Polycarbonate End Panel Kit 30 Wide 35 Wide Frame size and panel layout shown above may differ from actual frame Photo is used for illustration only ...

Page 2: ...oceed as instructed In most instances the end frame and door frame are constructed before end panels are installed This allows for the placement of panels as determined by the position of the door or doors It is the responsibility of the owner contractor to adjust the position of the end panels based on the end frame and the position of the installed door or doors Consult the services of a qualifi...

Page 3: ...ce Fine point marker to mark the location on panels Variable speed drill and impact driver cordless with extra batteries works best Scissors or utility knife and tool to cut the polycarbonate panels Hammers gloves and eye protection Ladders work platforms and other machinery for lifting designed to work safely at the height of the building and end wall ATTENTION Consult the services of a qualified...

Page 4: ... and photos will help you identify the different parts Some parts are not shown UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin Unpack the contents of the shipment and place 1 where you can easily inventory the parts Refer to the Bill of Materials Spec Sheets Verify that all parts listed on the Bill of Materials Spec 2 Sheets are pre...

Page 5: ...ipped This may include shifting the outside panels beyond the end rafter leg ground post so corner panels align with each other Install all UV protected surfaces to the outside toward the sun See information printed on the panel Set the first lower 50 x 12 2 panel in place as shown 1 with the edge aligned with the outside edge of the end rafter and the bottom edge flush against the ground Do not a...

Page 6: ...8 until the bottom row of end panels is installed Overlap and cut the final panel to fit as needed Remember to account for the installation of the sidewall panels if equipped Position and cut final panel as needed to create a finished corner Diagrams in the Quick Start section show a frame with sidewall panels installed Valley Install screws here Corrugated Panel Brace TOP VIEW A Rib Corrugated Pa...

Page 7: ...p The bottom edge of the upper panel overlaps the top edge of the lower panel Verify that the panel is in the desired position UV 12 protected side toward the sun and attach it to the end frame using Tek screws and washers Repeat the steps for the remaining upper panels 13 Verify panel and panel position by consulting the diagrams in the Quick Start section for your end panel kit Continue by readi...

Page 8: ...ight and in good condition Remove debris and objects that can accumulate on the shelter Use tools that will not damage the panels when removing debris Do not allow snow to pile up against the end wall and panels Use tools that will not damage the polycarbonate panels when removing snow Check the contents of the shelter to verify that nothing is touching the polycarbonate panels that could cause da...

Page 9: ...walls GROUND LEVEL Panel overlap seams Panel Kit for 30 Wide Frame R030B00007 Sidewall Panel Sidewall Panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 104621C 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel cut to fit Four 4 Upper Panels Two 2 50 x 8 2 104620C panels cut and trimmed to fit positions GROUND LEVEL Sidewall Panel Sidewall Panel Top edge of the low...

Page 10: ... needed to accommodate the door installation Install door or doors before end panels approximate width 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel Overlap and trim this 50 x 12 2 panel as needed Remember to position the panel so it meets the sidewall panels if present 50 x 8 2 panel cut in half and trimmed to fit position 50 x 8 2...

Page 11: ...reviously installed panel by one 1 rib approximate width 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel 50 x 12 2 panel cut in half and trimmed to fit position 50 x 12 2 panel cut in half and trimmed to fit position 1 2 of a 50 x 8 2 panel trimmed to fit position 1 2 of a 50 x 8 2 panel trimmed to fit ...

Reviews: