PREMIUM SOLAR STAR
™
GREENHOUSES
28
Revision date: 11.04.11
POLYCARBONATE ROOF PANELS (continued)
Repeat the steps to cut and attach the 1.5" x 1.5"
35.
square tube to the outside U-channel of the other
installed upper panels.
Install an additional Tek screw and washer at the end
36.
of the H-channel if needed to secure the channel to the
rafter.
After installing the first two upper panels, repeat
37.
the procedure as needed to prepare and install all
remaining upper panels for the greenhouse.
Diagram above shows the frame with an attached
baseboard. Length and width may differ from actual
frame. SEE SPECIAL NOTE ABOUT BASEBOARD
INSTALLATION.
Once all upper panels are installed as shown in the
38.
above diagram, read the special note about baseboard
installation that follows.
Position the square tube as shown below and hold it in
33.
place.
ATTENTION:
Align and install the tube as shown to
"lock" the upper and lower panels in place.
View shows the underside of the panels as seen from
inside the frame.
Once the tube is aligned, secure it to the aluminum
34.
profile of the upper panel by driving a Tek screw and
neo-bonded washer through from the outside and into
1.5" x 1.5" tube.
Assistance is required to hold the square tubing in
place as the Tek screws are installed from the outside
1.5" x1.5" Tube
View from inside
the shelter.
Sample frame showing all upper
panels installed. Dashed lines
show
upper edges of the
lower panels
.
Solid lines identify the lower edges of all upper
panels. Lower edge is capped with 104213 profile.
Ground Level
View from outside of
the shelter.
Upper Panel
Installed 104213
U-Channel
Lower Panel