PREMIUM SOLAR STAR
™
GREENHOUSES
16
Revision date: 11.04.11
INSTALL THE END WALL FRAME (continued)
Tighten the top band clamp and
23.
install a short Tek
screw through the clamp and into the rafter.
Repeat the procedure as needed to assemble and
24.
install the remaining vertical end wall supports.
Inside view
of end rafter
DOOR INSTALLATION
The door is installed between the middle vertical door
frame members of the end wall. The following steps
describe one way to install the door.
Move to the bottom of the door jamb and swing the
1.
tube outward as shown below.
ATTENTION:
If this tube is attached to the base rail,
remove the Tek screws and continue.
With the proper assistance, lift the door and position it
2.
in the opening.
With the door held in place, swing the loose vertical
3.
door frame tube back into position. Secure the bottom
of the door frame tube to the base rail using Tek
screws.
Choose the square tube for the door frame header and
4.
cut the swaged end to the proper length for the width of
the rough door opening.
Attach two (2) (#QH1330) angle brackets to the header
5.
using Tek screws. Verify the brackets are flush with the
tube ends.
ATTENTION:
The frame of the door is designed to
"wrap around" the vertical door frame tubes of the end
wall. Diagram below shows how the door is installed.
Door Trim
Door Frame Tube
TOP VIEW OF DOOR
Width of Door Frame
QH1330 Angle
Brackets
ATTENTION:
The vertical door frame tubes sit
within the frame channel of the door. The header
tube will sit on top of the installed door.
Rest of frame not
shown for clarity.