![ClearSpan 106183 Assembly Instructions Manual Download Page 17](http://html.mh-extra.com/html/clearspan/106183/106183_assembly-instructions-manual_2621744017.webp)
17
CLEARSPAN
™
VALUE LINE
Revision date: 10.05.10
Customer-Supplied
Baseboard
Cable
Assembly
Cable Assembly
B
Ground Level
A
QH1404
Band Clamp
CABLE PLACEMENT
The diagram and inserts below identify the placement and
proper way to attach the cable assemblies to the building.
Diagram below may be a different length shelter, consult
the Quick Start diagrams for proper cable placement for
your shelter.
1. Attach the first cable assembly at the bottom of the
center post using a band clamp as shown in drawing A.
2. Move to the top of the first interior rafter and wrap the
loose end of cable over the top of the upper purlin and
back under the purlin. Attach the remaining section of
the cable assembly using a cable thimble and two (2)
cable clamps. (See Drawing B).
NOTE:
No turnbuckle is needed; only one (1)
turnbuckle is used for each assembly.
3. Secure the band clamp to the center post frame using
a Tek screw.
4. Repeat the same procedures for the
remaining cable installation.
NOTE:
Frame shown may
be a different length from
actual frame.
TIGHTEN THE CABLING
1. After attaching both cable assemblies to the building
frame, return to the first turnbuckle and tighten the
cables.
NOTE:
Tighten the cables in each section evenly so
that the frame remains plumb.
2. After the first cable assembly is tightened, move to the
other assembly and repeat the tightening steps.
3. Continue with finishing rough edges of the frame.