BASEBOARD INSTALLATION (RECOMMENDED)
Gather the parts
• Treated or recycled plastic lumber (supplied by
customer).
• 5/16" x 3" Lag Bolts (supplied by customer)
NOTE:
The following procedure describes one way
to install the recommended baseboards. The size
and type of the baseboard you choose may require
the use of alternative steps. When properly installed,
baseboards run the length of the frame.
On the outside of the frame, attach the first baseboard
to the ground posts using the 5/16" x 3" lag bolts. Insert
the lag bolts, from the inside of the shelter, through the
ground posts into the baseboards. Continue adding
baseboards to complete the first run. Splices are made
between posts. Use a short section of baseboard to
secure separate baseboards at a splice.
NOTE:
The boards should be at ground level or slightly
into grade to prevent the shelter from sinking and to
create a seal along the bottom. After installing the
baseboards, continue with these instructions.
Inside of
Shelter
Outside of
Shelter
Ground Level
Space below is reserved for customer notes.
ANCHOR THE ASSEMBLED FRAME
At this point, anchor the frame. Consult the MUST READ
document for anchoring information and suggestions.
Please call customer service at 1-800-245-9881 for
additional anchoring information.
CAUTION
: The anchor assembly is an integral part
of the shelter construction. Improper anchoring may
cause instability and failure of the structure to perform
as designed. Failing to anchor the shelter properly
will void the manufacturer’s warranty and may cause
serious injury and damage.