19 CV1800 and CVMAX Installation Guide
© Clear Vue Cyclones 2018
Installing the Intake and Leveling the Cyclone
1. Rotate the cyclone, if necessary, so the portion of the intake chute extending from the cyclone
body is accessible.
2. Attach the intake transition to the cyclone by lining
up the pre-drilled holes and inserting (4) #6-18 x
3
∕
8
”
pan head screws.
3. Seal the seam between the chute and transition with
silicone.
4. Rotate the cyclone, if necessary, into position and
tighten the (6) clips on the top of the blower housing.
The position of the cyclone/blower housing
assembly can be rotated in any direction. This
will not affect system performance in any way.
5. Place a level across the top of the blower housing to ensure that the cyclone is level.
a. To raise the system upward, tighten the ¼”-20 nuts above the hanger plate, moving
them down the threaded rod assembly towards the floor. Loosen the ¼”-20 nuts
below the hanger plate as needed.
b. To lower the system downward, loosen the ¼”-20 nuts above the hanger plate,
moving them up the threaded rod assembly towards the ceiling.
When finished, the cyclone should be within a ¼” of being level in all directions.
6. Tighten the ¼”-20 nuts above and below the hanger plate so they are snug without causing
the bushings to bulge.
Wonder why there’s a hole in the side of your cyclone?
This hole allows for a small amount of air movement in the area above the inner ramp in
order to prevent dust from accumulating over time.
Do not plug this hole!